
The facility is powered by immersion cooling technology, which uses a non-conductive liquid to cool the mining hardware. This technology is more efficient than traditional air cooling methods, as it requires less energy and produces less noise. The facility is also equipped with advanced security measures, such as biometric access control and 24/7 surveillance.
The facility is expected to generate up to 200 MW of power, which is enough to power over 200,000 homes. This will help reduce the strain on the region’s power grid and reduce the cost of electricity for local residents.
The facility is also expected to create hundreds of jobs in the region, as well as attract new businesses and investments. This will help to boost the local economy and create new opportunities for the people of Abu Dhabi.
The launch of this facility is a major milestone for the region and a testament to the commitment of Zero Two and Marathon to the development of the Bitcoin industry. This facility is expected to be a major contributor to the growth of the industry in the region and will help to further cement Abu Dhabi’s position as a global leader in the Bitcoin mining industry.
NEW: 🇦🇪 Zero Two and Marathon introduce cutting-edge 200 MW immersion-cooled Bitcoin mining facility in Masdar City, Abu Dhabi 👀🙌

